Project Description
Electrical
- Infrastructure of power distribution;
- Infrastructure of illumination distribution;
- Infrastructure of instrumentation distribution;
- Fire alarm system for substation;
Utilities
- System of process water supply;
- Compressed air system;
- Assembly of pumping process;
- Water cooling system;
- System of natural gas, nitrogen, hydrogen oxygen and propane gas supply;
- Fire control system;
- Hydrostatic, LPI, radiograph and welding tests;
- Pipeline thermic isolation;
- Painting;
Installed power = 21 MVA
Pipe weight = 1200T
Mobilized labor peak = 245 pessoas
Star = Oct/2012
End = Dec/2013