Project Description

Electrical

  • Infrastructure of power distribution;
  • Infrastructure of illumination distribution;
  • Infrastructure of instrumentation distribution;
  • Fire alarm system for substation;

Utilities

  • System of process water supply;
  • Compressed air system;
  • Assembly of pumping process;
  • Water cooling system;
  • System of natural gas, nitrogen, hydrogen oxygen and propane gas supply;
  • Fire control system;
  • Hydrostatic, LPI, radiograph and welding tests;
  • Pipeline thermic isolation;
  • Painting;

Installed power = 21 MVA
Pipe weight = 1200T
Mobilized labor peak = 245 pessoas
Star = Oct/2012
End = Dec/2013