Project Description

Work: Expansion of the factory AGC Vidros do Brasil Ltda

Client: AGC Vidros do Brasil LTDA.

Project: . Guara II Project – P18 – Piping and erection – P27- Cables and erection  

Period: 05/15/2018 to 03/28/2019.

Brief report of the activities carried out

MECHANICAL:

Supply of materials and specialized manpower for manufacturing and assembly of Utility Pipes and accessories, for the construction of a second furnace.

  • Compressed Air;
  • Purge Air;
  • Natural Gas;
  • Hydrogen;
  • Nitrogen;
  • Nitrogen / Hydrogen;
  • Drink Water;
  • Main Cooling Water;
  • Extra Cold Water;
  • Demineralised Water;
  • High Pressure Water;
  • Emergency Water;
  • Raw Water; 

ELECTRICAL:

Supply of materials and specialized manpower, to carry out the services of Electrical Installations for the construction of a second furnace.

  • GE – General (Medium and Low Voltage Systems)
  • F2 – Float Line (Feeders / Power)
  • CE2 – Cold End (Feeders / Power)
  • GE – General Elec Utilities (External Lighting)
  • F2 Elec Utilities – Float Line (Internal Lighting / Outlets / SPDA / Grounding)
  • CE2 Elec Utilities – Cold End (Internal Lighting / Outlets / SPDA / Grounding)
  • WH2 Elec Utilities – Warehouse (Internal Lighting / Sockets / SPDA / Grounding)
  • F2 Elec Room Utilities (Floating Line Floors – Indoor Lighting / Outlets)
  • CE2 Elec Room Utilities (Cold End Electric Room – Indoor Lighting / Sockets)

Parameters of magnitude:

Electrical: 10.5 MVA Installed Power

Mechanical: 23000 meters of utility pipes, including all accessories

Labor force at the peak of the work: 170 people.