Project Description

Bridgestone Camaçari – BA

Period: 3 years (36 months)

  • Mechanical and Electrical Projects
    • Shielded Substation
    • Power Distribution in Beds for Cables
    • Armored Busway
    • Light Distribution
    • Medium Tension Cable Distribution
    • Sodium Illumination System
  • Utilities
    • Compressed Air System
    • Gas System
    • Vacuum System
    • Cold, Softened and Regenerative Water Network
    • Vapor System
    • Condensed Matter Network
    • Nitrogen System
    • Oil Network
    • Paint
    • Pump and Tank Installation
    • Internal and External Pipe Rack Assembly