Project Description
Bridgestone Camaçari – BA
Period: 3 years (36 months)
- Mechanical and Electrical Projects
- Shielded Substation
- Power Distribution in Beds for Cables
- Armored Busway
- Light Distribution
- Medium Tension Cable Distribution
- Sodium Illumination System
- Utilities
- Compressed Air System
- Gas System
- Vacuum System
- Cold, Softened and Regenerative Water Network
- Vapor System
- Condensed Matter Network
- Nitrogen System
- Oil Network
- Paint
- Pump and Tank Installation
- Internal and External Pipe Rack Assembly