Project Description

Enerray – Horizonte 1 – BA

  • Project: Assembly of solar park of Horizonte 1.
  • Client:   Enerray
  • Project: Horizonte 1
  • Period: April 2017  – present
  • Brief summary of activities

o   Low and medium tension solar cable installation.

o   Installation of 120.960 modules and 4.032 trackers;

o   Commissioning and Startup

  • Parameter of importance:

o   536.000 mts of cable installed;

o   Power –  38 MWp