Project Description

Enerray – Ituverava 7 – BA

  • Project: Assembly of Ituverava 7’s  solar park.
  • Client:   Enerray
  • Site: Ituverava 7 
  • Period: Feb. 2017 – present
  • Brief summary of activities:

o   Passage of medium and low tension solar cables
o   Electrical installation of 115.248 modules and 2.744 trackers
o   Commissioning and Startup

  • Parameters of Importance:

o   750.000 metes of cables installed
o   Potency of 36 MWp