Project Description

Goodyear – Americana – SP

Material and Labor supply for the execution and installation of the plant expansion of the Americana – SP site.

Period;
4 years (48 months)

Brief summary of activities:

  • Facilities (Electrical Package #2, #3, #4 and #5):
    • 7500 kVA Primary Substation (SEP 5 and 6) / 2300 V Power distribution;
    • Factory Substation 11, 13, 901, 1001, 1002, 1101, 1201;
    • Lighting Substation 18 and 19. Readjustment of SEIs 1, 2, 4, 6, 7 and 14.
  •  Mixers (Electrical Package #4): Banbury #7
    • body area network
    • dust colletor
    • carbon black
    • twin screw; batch off
    • Intercom system
    • 480 V power distribution.
  •  Preparatory (Equipment Setting #1) :
    • Extruder – 8X8Hexaplex;
    • Calander – Cal. 4R1, Cal 4R2 and Wire Calander (Cal. Z);
    • Cutters – Fischer, Mini slitter, Mother roll and Calemard; Bead Winder.
  • Tire Building Room (Eq. Sett. #1, Elec. Pack. #3, Phase 1.5):
    • Consumer: 06 TBM’s HF, 04 Apexers (Nakatas) All new conveyor system (Green Tire #1, #2, and #3)
    • Commercial: Mesnac
  • Curing (Eq. Sett. #1, Elec. Pack. #3):
    • 20 presses 46″ and 06 presses 52“
  • Final Finish (Phase 1 and 1.5):
    • Zone 15: All Conveyors System
    • Zones 16 and 17: Inspection Table
    • Zones 18 and 20: FVM and DBM Sorter
    • Zones 19 and 21: FVM and DBM Takeaway

 Peak mobilized labor; 640 people