Project Description

Indústria Vidreira do Nordeste – Estancia – SE

Project Greenfield Nordeste

Period: April-2015 – January-2016

Brief summary of activities;

  • Electric Installations:
    • assembly of medium tension panels: 13 cubicles
    • assembly of transformers MT – 7.700kVA
    • assembly of QGBT’s – 27 panels
    • assembly of capacitor banks: 6 painéis
    • assembly of field panels: 71 panels
    • distribution of  beds and electrical ducts: 9.000m
    • distribution of medium tension cables: 2.800m
    • distribution of low tension cables: 64.000m
    • distribution of lighting fixtures: 1.500 units
    • assembly of diesel generator groups: 1.500kVA
    • assembly of no-breaks: 150kVA
    • distribution of external illumination;
      • 32 projectors of 400w
      • 18 public light fixtures of 250w
    • Fire alarm systems;
      • 1 central for up to 150 equipments
      • 51 manuais activators
      • 51 sirens
      • 16 linear smoke detectors
      • 8 conventional smoke detectors
  • Mechanical Installations:
    • equipment assembly
      • air compressors: 8 units
      • air dryers: 8 units
      • ventilators: 28 units
      • air reservoir: 11 units
      • pumps: 37 units
      • tanks and reservoir: 7 units
      • cooling towers: 5 units
    • assembly, manufacturing and welding of pipes and connectors of carbon steel: 765 tons
    • assembly of valves: 1.978 units
    • manufacturing and assembly of base: 25t
    • assembly of fire hydrant system
      • pead pipe: 1.400m
      • carbon steel pipe: 92 tons
      • simple hydrant: 13 units
      • double hydrant: 45 units
  • Instrumentation
    • assembly of electro gutters: 750m
    • assembly of electro ducts and connectors: 2.400m
    • cable ducts and automation: 72.000m
    • installation of instruments and connectors: 522 units
    • execution of tubing in copper with connectors: 2.200m
    • execution of instrument support: 6,9 tons
    • assembly of instrumentation panels: 19 units
    • assembly of control cabinets: 11 units

total constructed area: 30.594m2