Project Description
Indústria Vidreira do Nordeste – Estancia – SE
Project Greenfield Nordeste
Period: April-2015 – January-2016
Brief summary of activities;
- Electric Installations:
- assembly of medium tension panels: 13 cubicles
- assembly of transformers MT – 7.700kVA
- assembly of QGBT’s – 27 panels
- assembly of capacitor banks: 6 painéis
- assembly of field panels: 71 panels
- distribution of beds and electrical ducts: 9.000m
- distribution of medium tension cables: 2.800m
- distribution of low tension cables: 64.000m
- distribution of lighting fixtures: 1.500 units
- assembly of diesel generator groups: 1.500kVA
- assembly of no-breaks: 150kVA
- distribution of external illumination;
- 32 projectors of 400w
- 18 public light fixtures of 250w
- Fire alarm systems;
- 1 central for up to 150 equipments
- 51 manuais activators
- 51 sirens
- 16 linear smoke detectors
- 8 conventional smoke detectors
- Mechanical Installations:
- equipment assembly
- air compressors: 8 units
- air dryers: 8 units
- ventilators: 28 units
- air reservoir: 11 units
- pumps: 37 units
- tanks and reservoir: 7 units
- cooling towers: 5 units
- assembly, manufacturing and welding of pipes and connectors of carbon steel: 765 tons
- assembly of valves: 1.978 units
- manufacturing and assembly of base: 25t
- assembly of fire hydrant system
- pead pipe: 1.400m
- carbon steel pipe: 92 tons
- simple hydrant: 13 units
- double hydrant: 45 units
- equipment assembly
- Instrumentation
- assembly of electro gutters: 750m
- assembly of electro ducts and connectors: 2.400m
- cable ducts and automation: 72.000m
- installation of instruments and connectors: 522 units
- execution of tubing in copper with connectors: 2.200m
- execution of instrument support: 6,9 tons
- assembly of instrumentation panels: 19 units
- assembly of control cabinets: 11 units
total constructed area: 30.594m2