Project Description

Material and labor supply for electrical assembly, mechanical and instrumentation of new plant in Goiana – PE

Client;  VIVIX VIDROS PLANOS (Former CBVP – CIA BRASILEIRA DE VIDROS PLANOS)

Project; Assembly of pipelines, mechanical equipments and electric interconnections and instrumentation
Period; 2 years (24 months)

Brief summary of activities:

Electrical

  • Installation of Medium and Low tension cables – 282,000 meters
  • Installation of grounding systems  – 52,000 meters
  • Installation of electrical infrastructure (electrical ducts, beds and supports);
  • Posts – More than 280 posts
  • Outlets, connecting boxes, illumination panels
  • Luminaries – More than 5,000 luminaries

Instrumental

  • Installation of optic and signal cables – 34,000 meters
  • Installation of instrumentations – more than 2,500 instruments 

Pipelines

  • Installation of pipelines and connectors made of carbon steel  – 18,000 meters
  • Installation of valves and connectors – more than 700 valves
  • Installation of fire control equipments – more than 800 equipments/accessories
  • Installations of PEAD pipelines and connections – more than 4.000 meters

Equipments

  • Installation of thermic heaters and accessories
  • Installation of motor pump sets
  • Installation of softener, filter and treatment of waste
  • Installation of overhead cranes
  • Installation of generators, compressors, dryers and centralized utility equipments
  • Electrical rooms, panels of MT and LT, transformers and transmission networks

Mobilized labor peak; 480 people