Project Description
Material and labor supply for electrical assembly, mechanical and instrumentation of new plant in Goiana – PE
Client; VIVIX VIDROS PLANOS (Former CBVP – CIA BRASILEIRA DE VIDROS PLANOS)
Project; Assembly of pipelines, mechanical equipments and electric interconnections and instrumentation
Period; 2 years (24 months)
Brief summary of activities:
Electrical
- Installation of Medium and Low tension cables – 282,000 meters
- Installation of grounding systems – 52,000 meters
- Installation of electrical infrastructure (electrical ducts, beds and supports);
- Posts – More than 280 posts
- Outlets, connecting boxes, illumination panels
- Luminaries – More than 5,000 luminaries
Instrumental
- Installation of optic and signal cables – 34,000 meters
- Installation of instrumentations – more than 2,500 instruments
Pipelines
- Installation of pipelines and connectors made of carbon steel – 18,000 meters
- Installation of valves and connectors – more than 700 valves
- Installation of fire control equipments – more than 800 equipments/accessories
- Installations of PEAD pipelines and connections – more than 4.000 meters
Equipments
- Installation of thermic heaters and accessories
- Installation of motor pump sets
- Installation of softener, filter and treatment of waste
- Installation of overhead cranes
- Installation of generators, compressors, dryers and centralized utility equipments
- Electrical rooms, panels of MT and LT, transformers and transmission networks
Mobilized labor peak; 480 people